Yesterday, on April 1, 2026, NASA launched Artemis II—the agency’s first crewed lunar mission since Apollo 17 in 1972—on a flawless liftoff at 6:35 p.m. EDT from Launch Complex 39B at Kennedy Space Center in Florida.

The massive Space Launch System (SLS) rocket, generating 8.8 million pounds of thrust, propelled the Orion spacecraft carrying four astronauts on a roughly 10-day journey that will take them farther from Earth than any humans have traveled before.

The international crew includes NASA Commander Reid Wiseman, Pilot Victor Glover, Mission Specialist Christina Koch, and Canadian Space Agency Mission Specialist Jeremy Hansen—the first Canadian to fly beyond low Earth orbit.

After a smooth ascent, the SLS solid rocket boosters separated and splashed down safely in the Atlantic for recovery, while Orion entered Earth orbit and began deploying its solar arrays.

Mission teams are now monitoring the spacecraft as it heads toward a free-return flyby of the Moon, with no landing or lunar orbit planned. The mission tests Orion’s life-support systems with humans aboard in deep space and paves the way for future lunar landings.

Crowds gathered across Florida’s Space Coast cheered as the rocket lit up the evening sky in a spectacular display of fire and smoke. NASA officials described the launch as “flawless,” and post-launch briefings confirmed that all systems performed as expected.

The crew is now en route, expected to reach the Moon’s vicinity around day six for close flyby observations before returning for a Pacific Ocean splashdown around April 11.

What’s Next: A Timeline for NASA’s Artemis Program

Artemis II is just the opening chapter in NASA’s ambitious plan to establish a sustained human presence on and around the Moon, ultimately preparing for crewed missions to Mars. Following a February 2026 program update that added an extra test mission and shifted the first landing, here’s the updated roadmap:

  • Now through mid-April 2026: Artemis II (Current Mission) – The ongoing 10-day crewed lunar flyby tests Orion in deep space. Data from this flight will validate systems for longer-duration missions.
  • Mid-2027: Artemis III – A crewed demonstration in low Earth orbit. Astronauts will rendezvous and dock with one or both commercial human landing systems (HLS) from SpaceX (Starship) and Blue Origin (Blue Moon). This mission focuses on in-space testing of life support, communications, propulsion, and new EVA suits—no lunar landing yet.
  • Early 2028: Artemis IV – The first crewed lunar landing under the Artemis program. Astronauts will touch down on the Moon’s surface using an HLS, marking humanity’s return to the lunar surface after more than 55 years.
  • Late 2028: Artemis V – Second crewed lunar landing, expected to include early elements of the Lunar Gateway station in orbit. This will build toward more complex surface operations.
  • 2029 and Beyond – NASA aims for at least one crewed lunar landing per year, expanding to longer surface stays, scientific exploration, and infrastructure development. The program will prepare technologies for eventual Mars missions.

With Artemis II now underway, the momentum is building. This isn’t just a return to the Moon—it’s the foundation for a long-term lunar economy and stepping stone to the Red Planet.

Stay tuned as the crew continues their historic voyage, and the next chapters of Artemis unfold.