The Artemis III crew poses for an official portrait (from left: Andre Douglas, Luca Parmitano, Randy Bresnik, Frank Rubio).
Credit: NASA/Bill Stafford
NASA took a major step forward in its return-to-the-moon program Tuesday, unveiling the four-person crew that will fly the Artemis III mission and providing new details about what that flight will actually look like — a profile that has changed significantly from the original plan.
The announcement was made live at 11:30 a.m. EDT at NASA’s Johnson Space Center in Houston, with the event streaming on NASA+ and the agency’s YouTube channel.
Meet the Crew
The four crew members named are commander Randy Bresnik, pilot Luca Parmitano, and mission specialists Andre Douglas and Frank Rubio. Parmitano is an Italian astronaut with the European Space Agency, making him the only non-American on the crew. NASA astronaut Bob Hines will train alongside the crew as the backup member.
The crew brings a wealth of spaceflight experience. Bresnik, a retired Marine Corps colonel and test pilot, previously flew on the Space Shuttle and served aboard the International Space Station. Rubio made history in 2022–2023 with a record-breaking 371-day mission on the ISS. Parmitano has logged two long-duration ISS missions of his own. Douglas, selected in NASA’s 2017 astronaut class, served as a backup crew member for Artemis II.
A Mission Redesigned
The flight the crew has been assigned to looks very different from what Artemis III was originally supposed to be. On February 27, 2026, NASA Administrator Jared Isaacman announced a major redesignation for the mission. Originally planned as the first crewed lunar landing since Apollo 17 in 1972, Artemis III was officially shifted to a low Earth orbit rendezvous-and-docking demonstration.
Under the new plan, Artemis III is scheduled for 2027 and will be a crewed flight in Earth orbit to demonstrate rendezvous and docking capabilities between NASA’s Orion spacecraft and two commercial Moon landers. Those maneuvers will rehearse the procedures needed for Artemis IV, now scheduled for 2028, which will take a crew to the Moon’s surface.
Think of it as NASA’s version of Apollo 9 — the critical dress rehearsal that paved the way for the Moon landing of Apollo 11.
How the Hardware Works
Unlike Artemis II, which used a traditional propulsive upper stage, Artemis III will use a non-propulsive “spacer”—a structural stand-in that mimics the mass and dimensions of an actual upper stage —currently being built in Alabama. Because of the spacer, Orion’s own European-built service module will handle the heavy lifting to transport the spacecraft and crew into Earth orbit.
That orbit is targeted at an altitude of 463 km with a 33-degree inclination. Once there, the crew will conduct rendezvous and docking tests with pathfinder landers being built by SpaceX and Blue Origin — the same vehicles intended to ferry astronauts to the lunar surface on Artemis IV.
The crew will spend more time in space and inside the Orion spacecraft than the Artemis II crew did, allowing NASA to further evaluate Orion’s life support systems. Artemis III could also debut an upgraded heat shield on the Orion capsule to withstand extreme re-entry heat and enable more flexible future re-entry profiles.
Building on Artemis II’s Success
The Artemis III crew inherits the momentum of a successful predecessor mission. Launched April 1, 2026, the Artemis II crew of Reid Wiseman, Victor Glover, Christina Koch, and Jeremy Hansen reached a maximum distance of 406,771 km from Earth — breaking Apollo 13’s long-standing human distance record of 400,171 km set in April 1970. The crew splashed down safely on April 10, 2026, and was recovered by the USS John P. Murtha.
The Road Ahead
The path to a 2027 launch has faced some turbulence on the hardware front. On May 22, 2026, SpaceX’s Starship Flight 12 suffered a mishap when Super Heavy Booster 19 was unable to ignite all planned engines, prompting an FAA mishap investigation.
Then, on May 28, 2026, Blue Origin experienced an explosion during a New Glenn static-fire test, destroying the transporter erector and at least one lightning protection tower at Launch Complex 36.
Despite those setbacks, Isaacman told FOX Business on June 4 that NASA is “laser focused on the lander” and committed to keeping the human landing system on track for the 2027 test mission.
With a crew now named and a mission profile locked in, the next chapter of America’s return to the Moon is no longer a distant goal — it’s a 2027 launch manifest with four names on it.
