NASA’s Artemis II mission, set to become the first crewed voyage around the Moon in over half a century, achieved a resounding success in its second wet dress rehearsal (WDR) on February 19, 2026, paving the way for a targeted launch as early as March 6.
During the test at Kennedy Space Center’s Launch Complex 39B in Florida, teams loaded the Space Launch System (SLS) rocket with more than 730,000 gallons of super-cold liquid hydrogen and liquid oxygen propellants.
The rehearsal simulated a full launch countdown, successfully completing two terminal countdown demonstrations: one planned halt at T-33 seconds and a recycled sequence ending at T-29 seconds around 10:16 p.m. EST.
This marked a major improvement over the first WDR earlier in February, where hydrogen leaks at the ground-to-rocket interface forced a halt.
In today’s 11 a.m. EST news conference (streamed live and available for replay on NASA’s YouTube and website), agency leaders hailed the results as a critical milestone.
Key highlights and quotes from the briefing include:
- NASA Launch Director Charlie Blackwell-Thompson expressed team pride, stating, “I felt like last night was a big step in us earning our right to fly. So, felt really good, very proud of the team.”
- Officials confirmed hydrogen leak concentrations remained well below safety thresholds throughout fueling, validating repairs such as replaced seals and a ground support equipment filter swap. A minor ground communication glitch was quickly addressed with backup systems, causing no disruption to propellant operations or objectives.
- Closeout crews practiced Orion spacecraft hatch sealing and other final pre-launch steps. Data review continues, but preliminary assessments show the system performed as expected.
While NASA has not locked in a firm date pending final analysis, the Flight Readiness Review, and pad work, the agency is now targeting March 6, 2026, as the earliest launch opportunity (with backups through March 9 and 11). Contingency windows in April remain available.
The four-person crew—Commander Reid Wiseman, Pilot Victor Glover, Mission Specialist Christina Koch (NASA), and Mission Specialist Jeremy Hansen (Canadian Space Agency)—entered pre-launch quarantine in Houston today to minimize health risks and maintain schedule flexibility.
Engineers are transitioning the rocket, mobile launcher, and Orion back to launch configuration. The ~10-day Artemis II mission will test deep-space capabilities in the Orion spacecraft, including life support, navigation, and high-speed Earth reentry, ahead of future lunar landings.
For the full conference replay, transcripts, photos, or ongoing updates, visit NASA’s Artemis blog (nasa.gov/artemis) or follow @NASA and @NASAArtemis on social channels.
